Fees
Planning & Zoning Fees
| Category I | ||
| 1 | Category I - Concept Site Plan | $400 + $350/DA |
| 2 | Category I - Detailed Site Development Plan | $400 + $1600/DA |
| 3 | Category I - Concept and DSDP Resubmittals, to address comments, Plan 2 and Plan 3 | $200/submittal |
| 4 | Category I - Concept and DSDP Resubmittals, to address comments, after Plan 3 | $400/submittal |
| 5 | Category I- DSDP Site Plan - Revision after PC Approval – Major Revision (requiring full redistribution & PC Re-approval). After initial resubmittal, see line 3 and 4 for fees. | $750 |
| 6 | Category I- DSDP Site Plan - Revision after PC Approval – Minor Revision (requiring partial redistribution & in-house re-approval only). After initial resubmittal, see line 3 and 4 for fees. | $400 |
| 7 | Category I - Revisions After Final Site Plan Approval revisions that do not change or intensify the existing use, vehicular access, or alter traffic patterns | $400/submittal |
| Category II | ||
| 9 | Category II - Conceptual Site Plan | $200 + $350/DA |
| 10 | Category II - Detailed Site Development Plan (DSDP) | $200 + $500/DA |
| 11 | Category II - Concept and DSDP Resubmittals, to address comments, Plan 2 and Plan 3 | $100/submittal |
| 12 | Category II - Concept and DSDP Resubmittals, to address comments, after Plan 3 | $200/submittal |
| 13 | Category II- DSDP Site Plan - Revision after Final Site Plan Approval – Major Revision (requiring full redistribution). After initial submittals, see line 11 and 12 for fees. | $300 |
| 14 | Category II- DSDP Site Plan - Revision after Final Site Plan Approval – Minor Revision (requiring partial redistribution). After initial submittals, see line 11 and 12 for fees. | $200 |
| 15 | Category II - Revisions After Final Site Plan Approval revisions that do not change or intensify the existing use, vehicular access, or alter traffic patterns | $200/submittal |
| 17 | Extension of Site Plan Expiration (Concept, DSDP or Final) (CCZO allows for 1 request per project) The extensions request must be submitted at least 30 days before the expiration date and have been reviewed within 6 months. | $200 |
| 18 | PCA Modification/Variances/Waiver Requests for Subdivisions (each request) | $250 |
| 19 | Re-Route for re-approval of Final Approved Site Plans prior to Building Permit | $500 |
| 21 | Site Inspections for Redline/As-Built Site Plans (each inspection) | $50 |
| Minor Subdivision (7 lots or fewer) | ||
| 22 | Minor Concept Plan | ($150 + $100/lot)/submittal |
| 24 | Minor Preliminary Plan | $300 + $100/lot |
| 25 | Minor Preliminary Plan Revision, to address comments prior to issuance of Preliminary Approval Letter | ($100 + $100/lot)/submittal |
| 26 | Minor Preliminary Plan Revision, after issuance of Preliminary Approval Letter | ($200 + $100/lot)/submittal |
| 27 | Minor Final Plats, Reviews 1 & 2 | ($300 + $100/lot)/submittal |
| 28 | Minor Final Plats, after Review 3 and after | ($250 + $100/lot)/submittal |
| 29 | Subdivision Waiver of Concept Plan – Minor Subdivision Only (subject to DPW approval ) | $250 |
| 30 | Administrative Revisions to Approved Subdivision Applications – No Redistribution. No Change in Conditions | $75 |
| Major Subdivision (8 residential lots or greater, or non-residential that requires site plan approval) | ||
| 31 | Major Subdivision Concept Plan | ($300 + $100/lot)/submittal |
| 33 | Major Subdivisions Preliminary Plan Revision. After PC Approval, Major Revision, requiring full redistribution & PC Re-approval | ($500 + $100/lot)/submittal |
| 34 | Major Subdivisions Preliminary Plan Revision. After PC Approval, Minor Revision, requiring partial redistribution & No PC Re-approval. | ($250 + $100/lot)/submittal |
| 38 | Major Subdivisions - in Tier 3 requiring a Public Hearing prior to Preliminary Approval (in this instance, DA is disturbed area and equal to the LOD). This is a one time fee in addition to usual application fees. | $1,500 + $200/DA in CA or $100/DA |
| 39 | Major Subdivisions - Preliminary Approval for Creation of a Public R/W in a TC, Requiring a Prior Public Hearing. This is a one time fee in addition to usual application fees. | $500 |
| 40 | Major Preliminary Plan | $500 + $100/lot |
| 41 | Major Preliminary Plan Revisions, Plan 2 and after | $500/submittal |
| 42 | Extension of Subdivision Expiration (Concept, Preliminary or Final) (CCZO allows for 1 request per project) The extensions request must be submitted at least 30 days before the expiration date and have been reviewed within 6 months. | $200 |
| 46 | Major Final Plats, includes Reviews 1 & 2 | ($300 + $100/lot)/submittal |
| 47 | Major Final Plats, Review 3 and after | $400/submittal |
| 50 | Review and Processing of Legal Documents | $35/document |
| 51 | Final Plat - Administrative Processing of Recording Plat Package (8 1/2” X 14”) | $75 |
| 52 | Final Plat - Administrative Processing of Recording Plat Package (18” X 24”) | $75 + $50/sheet |
| 53 | Replattings (8 1/2" X 14") | $150/document |
| 54 | Replattings (18" X 24") | $150 + $50/sheet |
| 55 | Replattings Boundary Surveys | $75/document |
| 56 | Replattings - Requiring Critical Area Review, one time fee on initial application only | Initial Fee + $25/DA |
| 57 | Replattings - Administrative Processing of Recording Plat Package (8 1/2” X 14”) | $50/document |
| 58 | Replattings - Administrative Processing of Recording Plat Package (18” X 24”) | $50 + $25/sheet |
| 59 | Supplemental Plans, for Plan 1 & 2 | $250/submittal |
| 60 | Supplemental Plans, for Plan 3 and after | $150/submittal |
| 61 | Supplemental Plans, Revisions to Approved Plans | $250/submittal |
| 62 | Supplemental Plans, Site Inspections | $50/each |
| 63 | Supplemental Plans, Bond Processing & Administration Fee | 15% of Bond Estimate |
| 65 | Conceptual Grading Plan for disturbance of existing or recorded | $200 + $250/DA |
| Conservation Areas or for grading prior to site plan approval | ||
| 66 | Reconsideration of an Approved Condition | $300/condition |
| (does not include application fee for revised plans required before or after consideration) | ||
| 67 | Extension of Approvals as required by the Planning Commission | $150 |
| 68 | Planning Commission Administrator (PCA) Administrative Variances (Site Plan & Subdivision) | $150 |
| 69 | Appeals to PC of PCA Decisions | $150/item |
| 70 | PC Modifications/Variances/Waiver Requests for Site Plan/Subdivisions (prior to approval) | $250/request |
| 71 | Contested Case Application | $1,500/application |
| 72 | Road Names - Request Application Form (in-house review and approval) | $35 |
| 73 | Road Names - Application for a Change in Existing Road Name (public and private R/W’s) | $250 |
| 74 | Request for Meeting Notes/Transcripts/Video | $35 (CD Audio) $55-$75 (Video) |
| 75 | Zoning Text Amendments | $1,000 |
| 76 | Zoning Map Amendments | $1,000 |
| 77 | Administrative Variance | $150 |
| 78 | Official Interpretation Requests (requires consultation with CAO) | $150 |
| 79 | Zoning Ordinance interpretation requests | $150 |
| 80 | Zoning Determination letter – identifying property zoning & permitted uses requiring interpretation | $150 |
| 81 | Zoning Certification letter – identifying property zoning and permitted uses | $150 |
| 82 | Buildable/Non-buildable Lot Determination letter | $150 |
| 83 | Zoning Site Inspection | $150 |
| 84 | Additional Inspection | $150 |
| 270 | Site Completion Bond Processing & Administration Fee | 15% of Bond Estimate |
| 85 | After-the-fact permits for Enforcement Case | $200 |
| 86 | Fine for signs in right-of-way | $500/sign |
| 87 | Tow Company Inspections & Compliance Letters | $50/site |
| 88 | Stop Work Order Fee- Illegal removal/Defacing | $500 |
| 89 | Citation | $500 |
| 90 | Site Inspection | $50/inspection |
| 100 | Staff Referral to BOA | $75/Variance |
| 95 | Variance, Non-Critical Area (Each Request) | $500 + referral fee |
| 258 | Variance, Critical Area | $600 + referral fee |
| 96 | Special Exception/Conditional Use | $750 + referral fee |
| 99 | Non-Conforming, Expansion of Structure or Change in Use | $700 + referral fee |
| 92 | Reconsideration of Previous BOA Decision | $400 |
| 93 | Decision on Alleged Error | $1200 + referral fee |
| 91 | Communication Tower Request | $2500 + referral fee |
| 259 | Modification to Referral (after submittal) | $50 |
| 260 | Modification to Variance, Non-Critical Area (after notices are posted)* | $350 |
| 261 | Modification to Variance, Critical Area or Environmental - Article 8 or 11 (after notices are posted)* | $450 |
| 98 | Modification to Special Exception Request (after notices are posted)* | $425 |
| 262 | Modification to Non-Conforming, Expansion of Structure or Change in Use (after notices are posted) * | $425 |
| 263 | Subpoena Request | $75 |
| 94 | Postponement/Continuance of Case - at applicant's request | $400 |
| 97 | Extension of Time for Special Exception | $500 |
| 264 | Revision to Previously Approved Variance | $400 |
| 265 | After-the-Fact Variance or Special Exception in Critical Area (fine required by Critical Area Law) | $500 + referral fee |
* Applicants are also charged for the cost of legal advertising
| 101 | Non-tidal Wetlands or Streams Delineation Waiver Request Fee | $50 |
| 294 | Non-tidal Wetlands or Streams Delineation Report Review | $100 |
| 102 | Agricultural Land Preservation Review - | $20/form |
| TDR Certification, TDR Allocation, TDR Transactions, APD and/or TDR Revisions | ||
| 103 | Floodplain Review including one Site Inspection | $250 |
| 104 | Shore Erosion Control Review including one Site Inspection | $50 |
| 105 | Marine Construction and Lateral Line Review | $25 |
| 106 | Floodplain Map Review - supplying a map to applicant | $25 |
| 107 | Critical Area and Non- Critical Area Vegetative Removal Permit Review (includes one inspection, if needed) | $75 |
| 271 | Site Inspection (initial or addition not covered under other fees) | $50 each |
| Streams and Wetlands | ||
| 108 | Non-critical Area, Non For. Con. wetland and stream Buffer Fees-in-Lieu (2:1) | $3.25/ sq. ft. |
| 272 | Non-critical Area, Non For. Con. wetland and stream Bond (2:1) | $3.25/ sq. ft. |
| 273 | Non-critical Area, Non For. Con. wetland and stream violation / ATF (4:1) | $3.25 per sf bond and $3.25 per sf fee |
| 274 | Non-critical Area, Non For. Con. wetland and stream violation / ATF repeat offender (4:1) | $3.25 per sf bond and $6.50 per sf fee |
| Forest Conservation Program | ||
| 109 | Preliminary Forest Conservation Plan Review (one-time fee, per project) | $250 |
| 295 | Preliminary Forest Conservation Plan Review Waiver Request Fee | $50 |
| 110 | Final Forest Conservation Plan Review (one-time fee, per project) | $150 |
| 111 | Standard Forest Stand Delineation (FSD) Plan Review (one-time fee, per project) | $200 |
| 112 | Simplified Forest Stand Delineation (FSD) Plan Review (one-time fee, per project) | $100 |
| 113 | Site Inspection | $50 each |
| 114 | Forest Conservation Pre-Application Review & Exemption Request | $50 |
| 115 | Declaration of Intent (DOI) | $25 each |
| 116 | Forest Conservation Bond Application (includes legal doc review and two planting inspections) | $200 |
| 296 | Forest Conservation Bond | based on Cost Estimate for plantings |
| 117 | Fees-in-Lieu of Mitigation – within Priority Funding Areas (PFA) | $1.00/sq. ft. |
| 118 | Fees-in-Lieu of Mitigation – outside Priority Funding Areas (PFA) | $1.20/sq. ft. |
| 119 | Non-Compliance Fee (for sq. ft. found to be in non-compliance) | $0.30/sq. ft. |
| 120 | Request for Extension of Forest Conservation Approval | $100 |
| Critical Area (Chesapeake Bay) Program | ||
| 120 | Critical Area Review (Building and Grading Permits) | $125 |
| 121 | Buffer Management Plan Review (major/minor - includes inspections) | $150 |
| 122 | Buffer Management Plan Review | $75 |
| (simplified - for building and grading permits and violations, includes inspections) | ||
| 123 | Critical Area Mitigation Planting Review (includes one inspection) | $50 |
| 124 | Critical Area Mitigation Planting Review - Additional inspections (2 or more visits) | $30 |
| 125 | Bond Administrative Fee (includes administration plus initial and final inspections) | 25% of bond |
| 275 | CA Bond Administrative Fee (includes administration plus initial and final inspections) | 25% of bond |
| Critical Area Mitigation Fees-in-Lieu | ||
| 126 | Fees-in-Lieu for Clearing within the 100 foot Buffer (1:1 &/or 2:1) Note this is for authorized activities that don't require a variance | $3.25/sq. ft. |
| 127 | Fees-in-Lieu for Clearing Outside of the 100 foot Buffer < 20% (1:1) | $2.00/sq. ft. |
| 128 | Fees-in-Lieu for Clearing Outside of the 100 foot Buffer 20-30% (1:1.5) | $3.00/sq. ft. |
| 129 | Fees-in-Lieu for Clearing Outside of the 100 foot Buffer > 30% (BOA 3:1) | $6.00/sq. ft. + variance required |
| 130 | Fees-in-Lieu for Clearing within the 100 foot Buffer > 30% (BOA 3:1) | $7.50/sq. ft. + variance required |
| 276 | Fees-in-lieu for any mitigation not separately called out shall be equivalent to the bond that would have been required | |
| Critical Area Bonds | ||
| 250 | Bond for Planting Outside the 100- foot Buffer (1:1) | $2.00/sq. ft. |
| 251 | Bond for Planting Inside the 100-foot Buffer (1:1 &/or 2:1) Note this is for authorized activities that don't require a variance | $3.25/sq. ft. |
| 277 | Violation / ATF work outside the buffer (4:1) | $2.00 per sf bond |
| 277 | Violation / ATF work outside the buffer (4:1) | $2.00 per sf fee |
| 278 | Violation / ATF work outside the buffer (4:1) repeat offender | $2.00 per sf bond |
| 278 | Violation / ATF work outside the buffer (4:1) repeat offender | $4.00 per sf fee |
| 279 | Violation / ATF Clearing outside the buffer (5:1) | $2.00 per sf bond |
| 279 | Violation / ATF Clearing outside the buffer (5:1) | $3.00 per sf fee |
| 280 | Violation / ATF Clearing outside the buffer (5:1) repeat offender | $2.00 per sf bond |
| 280 | Violation / ATF Clearing outside the buffer (5:1) repeat offender | $5.00 per sf fee |
| 281 | Violation / ATF work inside the buffer (7:1) (variance required) | $3.25 per sf bond |
| 281 | Violation / ATF work inside the buffer (7:1) (variance required) | $3.25 per sf fee |
| 282 | Violation / ATF work inside the buffer (7:1) repeat offender (variance required) | $3.25 per sf bond |
| 282 | Violation / ATF work inside the buffer (7:1) repeat offender (variance required) | $6.50 per sf fee |
| 283 | Violation / ATF clearing inside the buffer (8:1) (variance required) | $3.25 per sf bond |
| 283 | Violation / ATF clearing inside the buffer (8:1) (variance required) | $4.25 per sf fee |
| 284 | Violation / ATF Clearing inside the buffer (8:1) repeat offender (variance required) | $3.25 per sf bond |
| 284 | Violation / ATF Clearing inside the buffer (8:1) repeat offender (variance required) | $7.50 per sf fee |
| Solomons Town Center Tree Canopy | ||
| 256 | Solomons Town Center Tree Canopy Fees in Lieu | $2.00/sq. ft. |
| 257 | Solomons Town Center Tree Canopy Bond | $2.00/sq. ft. |
| 160 | Commercial Accessory Structure/Exterior Modification | $100 |
| 161 | Signs | $75 |
| 162 | New Single Family Dwelling | $100 |
| 163 | Residential Accessory/Modifications/Additions | $50 |
| 135 | Tower or Co-location Permits - Consultant Review | $900 |
| (consultant charges the County $260/hour – typical review 2 hours) | ||
| 8 | Tower or Co-location Permits - County Review | $450 |
| 16 | Initial Submittal Fee (This will cover the review cost by the independent consultant that will be billed to the county. This review fee will cover the initial reviews and be billed against at the hourly rate in this fee schedule. If this initial review fee collected does not cover the entire review of the project to final, approved attached fees will be billed at the hourly rate shown in this fee schedule and will be required before the project can move forward. | $5,000 |
| 20 | Independent Consultant Review fee | $210/hr |
Inspections & Permits Fees
| Building Permit - Residential | ||
| 266 | Residential Application Fee | $25 |
| 267 | Residential Revision/ Re-Route Fee | $25 |
| 136 | Permit Fee - Finished Floor Area/ sq. ft. | $0.12/sq. ft. |
| 137 | Permit Fee - Unfinished Floor Area/ sq. ft. | $0.06/sq. ft. |
| 138 | Residential Permit Fee - Remodel, Pier, etc. | $60 |
| 297 | Home Occupation Permit | $60 |
| Building Permit - Commercial | ||
| 268 | Commercial Application Fee | $100 |
| 269 | Commercial Use Application Fee (without modification) | $50 |
| 298 | Commercial Re-Route Fee | $50 / $100 |
| 139 | Use Permit (1 inspection) - (without modification) | $60 |
| 140 | Renovation/remodel Permit (up to 3 inspections) | $150 |
| 141 | New Construction Permit (up to 10 inspections) | $450 |
| 142 | Inspection Fee after 10 inspections | $60 per inspection |
| 143 | Sign Permit | $60 |
| 292 | Demolition Permit | $60 |
| 293 | Tent Permit | $60 |
| 144 | Stop Work Order Fee | 1st $60 / 2nd $250 |
| 299 | After the Fact Fee *Failure to secure a permit for either residential or commercial work | Up to 10X the Base Fee |
| 145 | Grading Permit Public Works Fees | $75 |
| 145 | Grading Permit - Soil Conservation Fees | $125 |
| New Installation | ||
| 300 | Residential Application Fee | $25 |
| 301 | Residential Revision / Re-Route Fee | $25 |
| 302 | Commercial Application Fee | $100 |
| 303 | Commercial Revision / Re-Route Fee | $100 |
| 146 | First Fixture | $100 |
| 147 | Each additional fixture | $10 |
| 148 | Each rough-in fixture | $10 |
| 149 | Each fixture left out in original permit application | $10 |
| 150 | Shower Pan Inspection | $60 |
| 151 | Additional Inspections | $60 |
| 304 | Water Conditioner Equipment | $120 |
| 152 | Water service connection to public system | $60 |
| 153 | Sewer service connection to public system | $60 |
| 154 | Subsoil Drains | $60 |
| 156 | Stop Work Order | 1st $60 / 2nd $250 |
| Gas | ||
| 157 | First Fixture | $90 |
| 158 | Each additional fixture | $10 |
| 159 | Each rough-in fixture | $10 |
| 160 | Tank and Trench | $60/inspection |
| Medical Gas | ||
| 161 | First Fixture | $90 |
| 162 | Each additional fixture | $10 |
| 305 | Stop Work Order | 1st $60 / 2nd $250 |
| 306 | After the Fact Fee *Failure to secure a permit for either residential or commercial work | Up to 10X the Base Fee |
| RESIDENTIAL | ||
| 307 | Residential Application Fee | $25 |
| 308 | Residential Revision / Re-Route Fee | $25 |
| Outlets | ||
| 309 | Outlets (Switches, lighting fixtures or receptacles are counted as one outlet) | $1 Each |
| 310 | Low Voltage per type (each different system to be calculated separately) | $1 Each |
| Equipment & Appliances | ||
| 167 | Outlet for single unit of 30 K.W. or less | $20 |
| 168 | Each additional unit, 30 K.W. or less | $5 |
| 169 | Outlet for single unit greater than 30 K.W. | $30 |
| 170 | Each additional unit, greater than 30 K.W. | $5 |
| Service Installations (2 inspections) | ||
| 311 | Service Feeder | $80 |
| 171 | Pole Service | $120 |
| 172 | Temporary Service | $120 |
| Swimming Pools | ||
| 173 | Above ground | $60 |
| 174 | In-Ground (4 inspections only - PBFS, Trench, PDB, & Final) | $150 |
| 175 | Additional inspection fee for encapsulation not done at same time as PDB inspection | $60 |
| 176 | Whirlpool/Hot Tubs (2 inspections only) | $60 |
| 177 | Additional Inspection | $60 Each |
| 178 | Generators - Each | $100 |
| 179 | Motors - Each | $10 |
| 180 | Elevators - (2 inspections) | $60 |
| 312 | Elevators - Additional Inspections | $60 Each |
| 181 | Photovoltaic & Wind Turbine Systems - DNI Additional fees for related elements (subpanel, outlets, etc.) | $120 Each |
| 313 | Energy Storage System - DNI Additional fees for related elements (subpanel, outlets, etc.) | 120 Each |
| 182 | Antennae/transmitters - Each (2 inspections) | $60 |
| 183 | Car Charger - DNI Additional fees for related elements (subpanel, outlets, etc.) | $120 Each |
| 314 | Residential Septic System | $80 |
| Service Meter Equipment & Feeders | ||
| 184 | Up to 400 Amps | $100 |
| 186 | Over 400 Amps | $120 |
| Subpanels | ||
| 187 | Up to 200 Amps | $40 |
| 188 | Over 200 Amps | $60 |
| Heavy Ups | ||
| 189 | Up to 400 Amps | $80 |
| 191 | Over 400 Amps | $120 |
| 192 | Work-With (Additional fees for related elements) | $60 Each |
| Miscellaneous | ||
| 193 | Minimum Residential Permit Fee | $100 |
| 194 | Additional Inspection Fee | $60 |
| 195 | Re-inspection Fee | $60 |
| 196 | Progress Inspection Fee | $60 (Per 1/2 Hour) |
| 197 | Additional Equipment | $60 |
| 198 | Stop Work Oder | 1st $60 / 2nd $250 |
| 199 | After the Fact Fee - *Failure to secure an Electrical permit for residential work | Up to 10x base fee |
| COMMERCIAL | ||
| 315 | Commercial Application Fee | $100 |
| 316 | Commercial Revision / Re-Route Fee | $100 |
| Outlets | ||
| 201 | Each | $2 |
| Low Voltage per type (each different system to be calculated separately) | ||
| 203 | Each | $2 |
| Equipment & Appliances | ||
| 204 | Outlet for single unit of 30 K.W. or less | $60 |
| 205 | Each additional unit, 30 K.W. or less | $15 |
| 206 | Outlet for single unit greater than 30 K.W. | $80 |
| 207 | Each additional unit, greater than 30 K.W. | $40 |
| Service Installations (2 inspections) | ||
| 317 | Service Feeder | $100 |
| 208 | Pole Service | $200 |
| 209 | Temporary Service | $150 |
| Swimming Pools | ||
| 210 | Above ground (2 inspections only) | $120 |
| 211 | In-Ground (4 inspections only - PBFS, Trench, PDB, & Final) | $200 |
| 212 | Additional inspection fee for encapsulation not done at same time as PDB inspection | $60 |
| 213 | Whirlpool/Hot Tubs (2 inspections only) | $120 |
| 214 | Additional Inspection | $60 Each |
| 215 | Generators - Each - Additional fees for related elements (subpanel, outlets, etc.) | $150 |
| 216 | Motors - Each | $20 |
| 217 | Elevators - (2 inspections) | 120 $150 |
| 318 | Elevators - Additional Inspections | $60 |
| 218 | Photovoltaic & Wind Turbine Systems - DNI Additional fees for related elements (subpanel, outlets, etc.) | $240 |
| 319 | Commercial Energy Storage System | $150 |
| 320 | Commercial Septic System | $150 |
| 219 | Antennae/transmitters - Each (includes 2 inspections) | $90 |
| 220 | Car Charger - DNI Additional fees for related elements (subpanel, outlets, etc.) | $240 |
| Service Meter Equipment & Feeders | ||
| 221 | Up to 800 Amps | $150 |
| 223 | 801 Amps to 1200 Amps | $300 |
| 224 | Over 1200 Amps | $400 |
| Transformers | ||
| 225 | Up to 75 kVA | $60 |
| 226 | 76 kVA to 150 kVA | $100 |
| 227 | Over 150kVA | $200 |
| Subpanels | ||
| 228 | Up to 400 Amps | $60 |
| 230 | Over 400 Amps | $100 |
| Service Equipment | ||
| 231 | Meter Bases | $60 |
| 232 | CT Cabinets | $60 |
| 233 | M.B. Enclosure | $60 |
| 234 | Main Switch | $60 |
| 321 | ATS | $60 |
| 322 | Main Panel | $60 |
| 323 | Switch Board | $60 |
| 324 | Other | $60 |
| Heavy Ups | ||
| 235 | Up to 800 Amps | $100 |
| 237 | Over 800 Amps | 120 $200 |
| 238 | Work-With - DNI Additional fees for related elements | $60 |
| Miscellaneous | ||
| 239 | Minimum Commercial Permit Fee | $200 |
| 240 | Signs (Includes 2 inspections) | $60 |
| 241 | X-ray equipment (Includes 2 inspections) | $60 |
| 242 | Fire Pump Inspection Fee | $100 |
| 243 | Additional Inspection Fee | $60 |
| 244 | Re-inspection Fee | $60 |
| 245 | Progress Inspection Fee | Each 1/2 Hour |
| 246 | Additional Equipment | $60 |
| 247 | Stop Work Oder | 1st $60 / 2nd $250 |
| 248 | After the Fact Fee - *Failure to secure an Electrical permit for commercial work | Up to 10x base fee |
Copies
| Fee | Amount |
|---|---|
| Letter/Legal-- Black and White Prints | $0.25/page |
| Letter/Legal-- Color Prints | $0.75/page |
| 18" x 24" | $4.00/page |
| 24" x 36" | $6.00/page |
| Larger than 24" x 36" | $10.00/page |
| Please note: Some large documents may have special pricing available |